The S Tower Residence – HAO Contracting
HAO case study

The S Tower Residence

A four-bedroom tower residence lifted from developer finish to the level of a new five-star branded residence.

Case study · visualisations of the proposed works
Location
Dubai Internet City, Sheikh Zayed Road
Type
Apartment fit-out
Size
5,062 sq ft · 4 bed, 5 bath
Programme
20–28 weeks
The property today

A 5,062 sq ft residence with panoramic views of the sea, the golf course and the city, handed over with a marble developer finish and an open-plan living and kitchen space.

The brief: Lift it to the level of a new five-star branded residence.

Related service: Apartment & penthouse fit-out

This case study shows how HAO Contracting would deliver this property. Images are visualisations of the works in progress and the finished result, prepared for the proposal.

Room by room

Living & dining

Scope
  • Fluted oak and walnut wall panelling
  • Column clad in honed stone
  • Cove and linear lighting

Kitchen & dining

Scope
  • Italian handleless kitchen in oak and taupe
  • Book-matched stone island and backsplash
  • Dining table for eight with sculptural pendant

Master bedroom

Scope
  • Fluted oak and fabric headboard wall
  • Wool carpet, sheer and blackout curtains
  • Cove lighting

Dressing room

Scope
  • Floor-to-ceiling oak wardrobes with bronze glass
  • Integrated lighting
  • Central island with stone top

Master bathroom

Scope
  • Book-matched warm marble
  • Floating oak vanity with double basins
  • Freestanding stone bathtub at the window
Materials

Honed travertine-look stone · book-matched marble · fluted light oak and walnut · bronze details · ivory bouclé, taupe and cognac leather · cove and linear lighting

Programme

From handover to move-in in 20–28 weeks

1

Design & approvals

3–4 weeks

Interior design, samples, building management and community approvals

2

Procurement

6–8 weeks

Italian kitchen, stone, joinery and loose furniture

3

Fit-out works

10–14 weeks

Strip-out, ceilings, joinery, stone, kitchen, bathrooms and lighting

4

Styling & handover

1–2 weeks

Furniture, art and styling, snagging and handover

HAO Contracting

Planning a similar project?

Tell us about it. Our Commercial Manager will call you back.

Seventh Heaven Penthouse – HAO Contracting
Next project

Seventh Heaven Penthouse

View project