Burj Khalifa Headquarters – HAO Contracting
HAO case study

Burj Khalifa Headquarters

A shell-and-core floor above level 140 turned into an ultra-premium corporate headquarters with a 360-degree view.

Case study · visualisations of the proposed works
Location
Burj Khalifa Corporate Suites, Downtown Dubai
Type
Office fit-out · shell & core
Size
6,073 sq ft · about 35 people
Programme
18–24 weeks
The property today

A 6,073 sq ft office in the Burj Khalifa Corporate Suites, handed over as shell and core: bare screed, exposed services and floor-to-ceiling glazing with a 360-degree view. Ten reserved parking spaces.

The brief: An ultra-premium corporate headquarters for about 35 people: reception, 34-desk open workspace, CEO and director offices, 14-seat boardroom, executive lounge and meeting room. Approvals: landlord, DCD and Civil Defence.

Related service: Office fit-outFAQ

This case study shows how HAO Contracting would deliver this property. Images are visualisations of the works in progress and the finished result, prepared for the proposal.

Room by room

Reception & lift lobby

Scope
  • Fluted walnut wall around the three lifts, bronze lift frames
  • Sculptural honed-stone reception desk
  • Waiting lounge in cognac leather

Open-plan workspace

Scope
  • 34 bench desks perpendicular to the glazing
  • Columns clad in honed stone
  • Wool-look carpet, linear LED, concealed sprinklers

CEO office

Scope
  • Walnut executive desk with stone top
  • Fluted walnut joinery wall
  • Lounge corner at the glazing

Boardroom – 14 seats

Scope
  • Walnut and stone table following the curved glazing
  • Media wall with large screen
  • Frameless glass front with bronze frame, acoustic ceiling

Executive lounge

Scope
  • Low sofas in taupe and cognac leather
  • Stone coffee table and wool rug
  • Walnut credenza
Materials

Walnut and fluted walnut · honed Calacatta-look stone · warm-grey wool-look carpet · frameless glass with bronze frames · brushed bronze · cognac leather · concealed sprinklers to UAE Fire Code

Programme

From handover to move-in in 18–24 weeks

1

Design & approvals

3–4 weeks

Layout, MEP design, landlord, DCD and authority approvals

2

Procurement

4–6 weeks

Joinery, glass, stone and furniture – factory-direct where it pays

3

Fit-out works

10–12 weeks

Ceilings, partitions, MEP incl. sprinklers, finishes, joinery and AV

4

Snagging & handover

1–2 weeks

Testing, Civil Defence inspection and completion certificate

HAO Contracting

Planning a similar project?

Tell us about it. Our Commercial Manager will call you back.