Redwood Avenue Villa – HAO Contracting
HAO case study

Redwood Avenue Villa

A classic golf-course villa stripped back to its structure and rebuilt as a modern home – new facade, large glazing, new interiors and a new garden.

Case study · visualisations of the proposed works
Location
Jumeirah Golf Estates, Dubai
Type
Villa renovation
Size
14,542 sq ft · 6 bed + basement
Programme
32–42 weeks
The property today

A six-bedroom villa with basement on a large plot overlooking the golf course, with a pool and a mature garden, in its original classic style with pitched roofs, French doors and arched details.

The brief: Strip back to the main structure and rebuild as a modern villa with large windows and a new garden. Approvals: master developer and Dubai Municipality.

Related service: Villa renovation

This case study shows how HAO Contracting would deliver this property. Images are visualisations of the works in progress and the finished result, prepared for the proposal.

Room by room

Garden & pool

Scope
  • Flat-roof facade in stone, render and timber slats
  • Large floor-to-ceiling glazing
  • Natural lawn, planting and olive trees
  • Modern pool with stone coping and deck

Front facade & entrance

Scope
  • Same massing and garage positions
  • Pivot entrance door and timber-slat garage doors
  • Large-format pavers with lawn strips

Living room

Scope
  • French doors replaced by large sliding glazing
  • Honed stone floor and oak feature wall
  • Cove lighting in a flat ceiling

Kitchen – new layout

Scope
  • New open-plan kitchen on the garden side
  • Book-matched stone island with four stools
  • Tall units with integrated appliances

Entrance hall

Scope
  • Tall oak pivot front door
  • Light oak wall panelling
  • Modern glass balustrade above

Bedroom

Scope
  • Larger floor-to-ceiling window
  • Oak floor and upholstered headboard wall
  • Built-in oak wardrobe
Materials

White render · large-format natural stone · vertical timber slats · slim black aluminium glazing · honed stone floors · light oak joinery · natural lawn, olive trees and a stone-coped pool

Programme

From design to move-in in 32–42 weeks

1

Design & permits

6–8 weeks

Architecture, structure check, master-developer and Dubai Municipality permits

2

Strip-out & structure

8–12 weeks

Demolition back to the main structure, new openings, roof and facade frame

3

MEP, finishes & landscape

16–20 weeks

New MEP, glazing, stone, joinery, kitchens, bathrooms, pool and garden

4

Handover

2 weeks

Testing, authority completion, snagging and handover

HAO Contracting

Planning a similar project?

Tell us about it. Our Commercial Manager will call you back.

Sienna Lakes Villa – HAO Contracting
Next project

Sienna Lakes Villa

View project