Sienna Lakes Villa – HAO Contracting
HAO case study

Sienna Lakes Villa

A golf-view Mediterranean villa from the 2000s, rebuilt as a light, modern family home with large windows and a new garden.

Case study · visualisations of the proposed works
Location
Jumeirah Golf Estates, Dubai
Type
Villa renovation
Size
9,484 sq ft · 5 bed + basement
Programme
32–42 weeks
The property today

A five-bedroom Siena-type villa with basement, pool and golf views, in its original Mediterranean style: arches, pitched roofs, small windows and a classic interior.

The brief: Strip back to the main structure and rebuild as a modern villa with large windows and a new garden. Approvals: master developer and Dubai Municipality.

Related service: Villa renovation

This case study shows how HAO Contracting would deliver this property. Images are visualisations of the works in progress and the finished result, prepared for the proposal.

Room by room

Garden & pool

Scope
  • Flat-roof facade in stone, render and timber slats
  • Large floor-to-ceiling glazing
  • Modern pool with stone coping and timber deck

Living room

Scope
  • Large glazing to the garden
  • Oak media wall with linear fireplace
  • Honed stone floor and cove lighting

Entrance & staircase

Scope
  • Floating stone staircase
  • Frameless glass balustrade with oak handrail
  • Double-height oak panelling and sculptural pendant

Kitchen

Scope
  • Handleless kitchen in oak and taupe
  • Book-matched stone island
  • Large garden windows and integrated appliances

Master bedroom

Scope
  • Floor-to-ceiling window to the garden
  • Fluted oak headboard wall
  • Wool carpet and cove lighting
Materials

White render · large-format natural stone · vertical timber slats · slim black aluminium glazing · honed stone floors · light oak joinery · natural lawn, olive trees and a stone-coped pool

Programme

From design to move-in in 32–42 weeks

1

Design & permits

6–8 weeks

Architecture, structure check, master-developer and Dubai Municipality permits

2

Strip-out & structure

8–12 weeks

Demolition back to the main structure, new openings, roof and facade frame

3

MEP, finishes & landscape

16–20 weeks

New MEP, glazing, stone, joinery, kitchens, bathrooms, pool and garden

4

Handover

2 weeks

Testing, authority completion, snagging and handover

HAO Contracting

Planning a similar project?

Tell us about it. Our Commercial Manager will call you back.

The S Tower Residence – HAO Contracting
Next project

The S Tower Residence

View project