Warehouse & steel structure construction in Dubai.
Warehouses, steel sheds, mezzanine offices and long-span roofs – from plot to handover, with steel and cladding priced in the UAE and direct from the factory in China.
What we build
Warehouses & logistics sheds
Steel portal-frame warehouses with sandwich-panel roof and walls, loading bays, roller shutters and external works.
Industrial plot package
One contract for the shed, a mezzanine office block, MEP, fire safety and external works – ready to fit out and operate.
Mezzanines & steel extensions
Steel mezzanine floors on decking, extra bays and canopies added to existing buildings.
Long-span roofs & canopies
Sports halls, padel canopies and architectural steel, built on our group's experience with stadium and velodrome roofs.
How a warehouse project runs
- 01
Brief & plot check
Plot affection plan, use, clear height, crane and floor-load needs, budget and target date.
- 02
Design coordination
Structure, steel connections, MEP and fire safety coordinated before anything is ordered.
- 03
Approvals
Submissions to the authority that controls your plot – Dubai Municipality, the free-zone authority or the master developer – and Civil Defence and DEWA.
- 04
Procurement
Steel, sandwich panels, doors and MEP priced in the UAE and direct with factories in China; awarded on full landed cost and lead time.
- 05
Construction
Foundations and slab, steel erection, cladding, MEP and external works, with daily progress reports.
- 06
Handover
Testing, authority inspections, completion certificates and as-built documents.
Questions owners ask us.
What affects the cost of a warehouse in Dubai?
Mainly the floor area, clear height and span, the cladding and insulation, the floor slab design load, the mezzanine and office areas, MEP and fire-fighting requirements, and ground conditions. Steel and panel prices also move with the market, which is why we price them in the UAE and in China.
How long does it take to build a warehouse?
It depends on size, approvals and steel lead time. Steel fabrication and delivery usually set the critical path, so we order steel as early as the approved design allows. Every proposal includes a programme for your project.
Do you build in free zones such as JAFZA or Dubai Industrial City?
We build wherever the project needs us in the UAE. Each free zone has its own approval process, and we plan the submissions and inspections with that authority from the start.
Can you supply the steel structure from China?
Yes. Our procurement team works in Dubai and in China. We compare factory-direct steel and panels with UAE suppliers, inspect before shipment and manage shipping to Jebel Ali and customs.
Can you add a mezzanine or extension to an existing warehouse?
Yes. We check the existing structure and foundations, design the new steel and get the approval for the modification before work starts.
Do you also do the offices, MEP and fit-out?
Yes. Offices, MEP, fire safety, external works and interior fit-out can all be in one contract with us.